Aa
Home
Entertainment
Sports
Politics
Fashion
Business
Health
Education
Financial
Home
>
business

Grid strain threatens APAC's energy transition timeline | Asian Power

Yasr Fatahywanany
Published on 2026-09-23 02:55:00
News Site
Grid strain threatens APAC's energy transition timeline | Asian Power

Grid strain threatens APAC's energy transition timeline

China, Japan, India, and Australia are hitting different versions of the same bottleneck.

World energy leaders are facing sharper trade-offs as electricity demand accelerates and system constraints multiply, with power markets across Asia-Pacific showing some of the starkest examples of the shift.

The World Energy Council's 2026 World Energy Trilemma report said that China has the “world's most advanced long-distance transmission system,” with its nearly 50 ultra-high-voltage transmission projects that have delivered over 420 gigawatts (GW) of cross-regional capacity.

The infrastructure answers a geographic mismatch between renewable resource zones and demand centres.

It has also held retail power tariffs unchanged for 20 years as a deliberate social-stability measure, even as market-based trading has already lowered industrial and commercial costs.

“Provincial markets are being integrated into a national one—basic unification is targeted for 2030, with completion by 2035, designed to sequence reform without exposing consumers to price shocks,” the report said.

Separately, China has turned energy security into a manufacturing-...

Recommend

  • Copyright © Pubnews.online
  • Privacy Agreement
  • About us
English